We price on the volume of material in your part — and we will show you the arithmetic. Your CAD gives us a volume in cm³, the grade’s density turns that into grams, and the material cost follows from there. Three lead time tiers priced openly, every finishing option published as a percentage, and instant online pricing on up to 100,000 parts.
3D printing cost UK · how 3D printing is priced · express 3D printing lead times · instant 3D printing quote · 024 7736 0144

Most bureaux treat pricing as a black box. It is not complicated, and knowing the model tells you exactly where to push if the number comes back higher than you wanted.
Volume in cm³ × material density = weight in grams
Weight in grams × cost per gram of that grade = the material cost of your part
That material figure is the foundation of the price. Machine and build time, the share of the bed your part occupies, the lead time tier you choose, and any finishing beyond the standard then sit on top of it — but the volume of material is what moves the number most, and it is the part you control.
The quote tool asks you to enter an email address before it prices your file, and we would rather explain that than have you hit it unannounced. It is not a lead-capture gate dressed up as a feature — you are uploading proprietary CAD, and we need every file that enters our systems to be attributable to someone. That is what our Cyber Essentials certification and our ISO 9001 traceability require, and it is how we can tell you months later exactly which file a batch of parts came from. Your files stay inside our own systems and nothing is brokered out. If you would rather have an NDA in place before you upload anything, say so first and we will arrange it.
Not the bounding box — the actual solid volume of the model, in cubic centimetres. This is why a hollowed part and a solid one of identical outside dimensions price very differently, and why complexity itself costs nothing: an intricate lattice with less material in it is cheaper than the plain block it replaced.
Every grade has a published density, so the conversion is fixed and checkable. MJF PA 12 is 1.01 g/cm³, so an 80 cm³ part is about 81 g of material. A denser grade at the same geometry weighs more and therefore costs more — our SLA flame-retardant resin is 1.25 g/cm³, which is roughly a quarter more material for the identical part.
An unfilled nylon and a carbon-filled composite are not the same price per gram, and a specialty resin is different again. This is why specifying a high-performance grade for a part that never sees load costs money for nothing — tell us what it actually has to survive and we will recommend the cheapest grade that does it.
On the powder processes you are effectively buying a share of the build. A tall part blocks that Z height for everything else even if it is slim, so parts that nest efficiently price better than parts that waste the space around them.
Unit cost falls as the bed fills, which is why additive gets genuinely competitive at volume rather than only at prototype quantities. A full bed is a cheap bed — and it is why ordering 500 in one go beats ordering 100 five times.
Express adds 50%, economy takes 10% off. Shot blasting and black dyeing are included at no cost; vibro polishing, vapour smoothing, inserts and A-class paint are each a defined percentage. All set out in full below.
Three tiers, and we publish exactly what each does to the number. If the date is not critical, economy is a straightforward 10% off the same part in the same grade.
Express
1–3 days
SLS, FDM and SLA only
+50% on the price
For a deadline that genuinely will not move. Your parts get priority on the build schedule, which means we cannot wait to nest them efficiently alongside other work — that is what you are paying the premium for.
Standard
5–7 days
All four processes
Normal pricing
The default, and the right answer for most jobs. Enough time for us to plan the build properly, and the tier every price you see quoted is based on unless you choose otherwise.
Economy
10–15 days
All four processes
−10% on the price
Give us the flexibility to fit your parts into builds where the space would otherwise go to waste, and we will pass the saving back. Ideal for stock replenishment, non-urgent spares and anything where the date is soft.
Express is not available on MJF. That process runs standard or economy only. If a deadline is tight and MJF was the plan, talk to us — SLS PA12 covers a great deal of the same ground and does run express. Lead times are working days from order confirmation, and finishing, machining and assembly are additional to the print time.
Two of them cost nothing at all. The rest scale with the job rather than landing as a flat fee on a small order. Everything below is done in-house on our own finishing floor.
| Finish | Cost | What it does |
|---|---|---|
| Shot blasting | Included | Cleans and evens the surface after depowdering. Standard on powder-bed parts at no additional cost. |
| Black dyeing | Included | A uniform black finish on SLS and MJF nylon, reaching internal geometry and adding no measurable wall thickness. No cost. |
| Threaded inserts | +5% | For up to 10 inserts per part. Above that, we will quote it. Gives durable metal threads rather than tapping into polymer. |
| Vibro polishing | From +10% | Tumbled finish for a smoother, more consistent surface across a batch. Longer cycles for a finer result are priced accordingly. |
| Vapour smoothing | +25% | Reflows the surface to a sealed, semi-gloss finish. Changes surface geometry slightly, so flag critical dimensions. |
| A-class painting | +25–50% | Show-surface paint to automotive standard. Where it lands in that range depends on the size of the part and the finish you specify. |
| Assembly, bonding & machining | Quoted | Bonded sections beyond the build envelope, machined critical features, and full assembly. |
All percentages are of the part cost, which has two useful consequences. Because shot blasting and dyeing are included, a black SLS or MJF part with a clean, even surface costs exactly the same as an unfinished one — which is why we treat dyed black as the sensible default rather than an upsell. And because the rest are proportional, hollowing a part to reduce its material cost reduces its finishing cost with it.
One geometry, showing how the material figure moves. These are material weights, not prices — for the actual number, run it through the instant quote.
Densities are published on every material datasheet with the test method cited, so you can run this arithmetic yourself before you even send us the file. Cost per gram differs by grade on top of the weight difference shown here.
All of these are things we would raise at design review anyway. Doing them before you quote just gets you there faster.
The single biggest lever, because you are paying for cm³ — and because every finish is charged as a percentage of part cost, a lighter part is cheaper to finish too. Shell to an even wall, add ribs, and remember the drain holes.
10% off for giving us 10–15 days instead of 5–7. If the date is soft — stock replenishment, spares, anything not blocking a build — this is free money.
A batch that packs into a single build costs less per part than the same total split across separate builds. If you know the annual volume, tell us — it changes how we plan the job.
Both the density and the cost per gram change with the grade. Tell us what the part actually has to survive and we will recommend the cheapest grade that does it, rather than the strongest one available.
A-class paint at +25–50% is the most expensive thing you can do to a part, and it is money wasted on an internal bracket. Shot blasting and dyeing cost nothing — if a clean uniform black part does the job, you are already done.
It costs nothing and avoids the rework loop entirely — we can adjust geometry cleanly, add drain holes or machining stock, and mesh at the right resolution. See file preparation.
Which tiers each process supports, and the largest single piece it will produce.
| Process | Express +50% | Standard | Economy −10% | Build envelope |
|---|---|---|---|---|
| SLS | 1–3 days | 5–7 days | 10–15 days | 165 × 165 × 300 mm · 490 × 490 × 740 mm for PA12-CF |
| FDM | 1–3 days | 5–7 days | 10–15 days | 500 × 500 × 900 mm · 340 × 320 × 340 mm for PPA-CF |
| SLA | 1–3 days | 5–7 days | 10–15 days | 353 × 196 × 350 mm |
| MJF | — | 5–7 days | 10–15 days | 380 × 284 × 380 mm |
Parts larger than the envelopes above are printed in sections, bonded and finished in-house, which adds time — send the overall dimensions with the enquiry and we will confirm against your date before you order.
Volume pricing is available through the quote tool rather than behind a sales conversation, so you can model the economics of a programme before you commit to it.
If you are ordering a large batch and the date is not critical, the 10% economy discount applies on top of the volume pricing — worth planning for on scheduled replenishment.
If you order regularly we will set up an account with a dedicated account manager and part history held on it, so repeat batches do not need re-quoting or re-specifying from scratch.
Under our ISO 9001 system, with PPAP 1–4 approval available for programmes that need documented process control rather than a certificate of conformity.
We would rather lose a job than take money for the wrong process.
Additive gets cheaper as the bed fills, but injection moulding still wins on unit cost for simple geometry at true production volume. If the tooling pays back over your programme, we will say so.
You are paying for cm³. A large solid part with no opportunity to hollow it is often better machined from stock, and we will tell you rather than quote it.
Our standard is ±0.3 mm to 100 mm. If the drawing needs hundredths across the whole part, that is near-net plus machining, or it belongs on a mill. See tolerances & accuracy.
Express is 1–3 days on three of the four processes and does not exist on MJF. If your date is not achievable we will say so at enquiry rather than take the order, take the premium, and miss it.
Instant online pricing on up to 100,000 parts across SLS, MJF, FDM and SLA, with a free design review on every quote. You will be asked for an email address so the file is traceable to you — that is the only thing standing between you and the number.
Printed, finished and inspected at our own ISO 9001 facility in Shipston-on-Stour, Warwickshire. Mon–Thurs 8am–4pm, Fri 8am–2pm. Call 024 7736 0144 or email hello@ryse3d.com.